New Transload Operation
The newly constructed 6.3 miles of rail which includes a 2 mile rail loop has the ability to hold any size unit train. With its new 1,400’ long transload pad, dual scales and scale house it is ready for a 24 hour operation for any frac sand, liquid or dry cargo, and with the ability to transfer to pipeline, trucks, or onsite storage facilities.

The rail park is centrally located with close access to a major interstate highway and centered between 2 major metroplex areas. It has all the things necessary to contribute to the success of anyone needing to transload bulk commodities from rail to other forms of transportation.